|
|
 |
Albuquerque NM- Lowering Pipe into shaft
| |
 |
Albuquerque NM- looking in shaft
| |
 |
Ashland NE 12 inch NO-DIG
| |
|
 |
Atlanta GA McDaniel Basin PTMT Jacking Shaft
| |
|
|
|
 |
Austin TX- Magnafluxing Pipe
| |
 |
Kailua HI 8 inch NO-DIG PTMT into shaft
| |
 |
Kailua HI 8 inch NO-DIG PTMT Jacking Shaft
| |
 |
Kailua HI 8 inch NO-DIG PTMT
| |
 |
Logan UT - 15 inch PTMT - Lowering pipe section
| |
 |
Logan UT PTMT Project - 1st pipe section behind reamer
| |
 |
Logan UT PTMT Project - removing spoil bucket
| |
 |
Logan UT PTMT Project - Shaft caisson lining installation
| |
 |
Logan UT PTMT Project - Jacking Shaft
| |
 |
Logan UT PTMT Project - making up pipe joint
| |
 |
Logan UT PTMT Project - Shaft Auger Excavation
| |
 |
Logan UT PTMT Project Footprint
| |
 |
Mall Of America Bloomington MN 18 inch PTMT
| |
 |
Mall of America Project -PTMT 2 Step Auger
| |
 |
Mall of America Project Bloomington MN
| |
 |
Middletown DE 12 inch PTMT jacking pipe
| |
|
 |
Sacramento CA 8 inch PTMT laterals- jacking shaft
| |
|
 |
Sacramento CA 8 inch PTMT laterals
| |
 |
Sacramento CA Fruitridge Sewer 8 inch PTMT laterals
| |
 |
Toledo OH PTMT 2 stage reaming head with lubricant ports
| |
 |
Toledo OH PTMT Jacking Frame
| |
 |
Toledo OH PTMT Reception Pit
| |
 |
Tomball TX - PTMT - Lowering 27 inch ID - 32 inch OD NO-DIG
| |
 |
Tomball TX 160 Ton Jacking Frame inside 9 ft round shaft
| |
 |
Tomball TX 27 inch NO-DIG fitted with 2 stage auger casing
| |
 |
Tomball TX 27 inch NO-DIG 1st load arrival
| |
 |
Tomball TX 27 inch NO-DIG 1 Meter Length
| |
 |
Tomball TX Reception Pit for Pilot Tube Retrieval
| |
 |
Saint Louis Galleria- 18 inch pipe staging
| |
 |
Saint Louis Galleria- lowering pipe section #1
| |
 |
Saint Louis Galleria- lowering pipe section #2
| |
 |
Saint Louis Galleria- PCH Launch
| |
 |
Saint Louis Galleria- Powered Cutter Head
| |
 |
Saint Louis Galleria- Project Footprint
| |
 |
Saint Louis Galleria- Drive 3- alignment under service tunnel
| |
 |
Saint Louis Galleria- PCH enters reception shaft
| |